Line Creek Elementary School
2007- 2008 Kc Architects designed an administration office addition, remodeled the interior, and completed entry security upgrades.
2007- 2008 Kc Architects designed an administration office addition, remodeled the interior, and completed entry security upgrades.
Shawnee, KS 2007 Mission Valley Middle School was one of seven middle school projects Kevin Cowan Architects developed for the Shawnee Mission School District during their latest bond and infrastructure improvements program. This school included a Library addition. This project included Science Classroom upgrades, Stage, and Theatrical equipment upgrades, and misc other renovations throughout the…
Shawnee, KS KC Architects completed a new 14,700 SF addition housing a gymnasium with a state-of-the-art performing arts stage, a fitness room, and a new after-hours entry vestibule and lobby for the gymnasium.
Overland Park, KS This project includes a complete renovation of existing exterior masonry walls that had excessive moisture and inadequate insulation. Various additions were incorporated into the design to supplement classroom storage and building access as well as enhance the exterior aesthetically. Ultimately the design solution addressed the failure of the exterior walls and also…
The renovation of the existing facility built as a middle school will now accommodate pre-schoolers in an early childhood program. This included replacing the classroom and corridor’s original casework and lockers with new appropriately sized casework and cubbies. Existing student restrooms were gutted and reworked to be ADA-compliant with preschool-sized fixtures. The area previously occupied…
Prairie Village, KS Multiple additions including a new Kindergarten classroom wing with adjacent vehicular drop-off access and dedicated outdoor playground space. The new wing includes a centralized collaborative learning space.
Shawnee Mission, KS Budget: $1,200,000.00 2008 Indian Woods Middle School was one of seven middle school projects KC Architects developed for the Shawnee Mission School District during their latest bond and infrastructure improvements program. KC Architects programmed and developed educational specifications to meet the school district’s budget and facility needs. The existing small library was…
Kansas City, KS Adding two new Pre-K classrooms, two student restrooms, one adult restroom, a small entry/elevator lobby, and miscellaneous mechanical and janitor rooms all in an existing 2,000 SF basement formerly housing boiler and mechanical space, storage, and District IT offices. New doors and windows to replace aged doors and windows, including a new…
Kansas City, MO KKC Architects was commissioned by Executive Hills Inc. to provide multiple renovations to the existing Office Building located at 1740 State Line in KCMO for the Corinthian College. New classrooms, labs, offices, break-out rooms, testing rooms, etc. were provided or renovated to accommodate the requirements of Corinthian College. This 3-story, $3.1 M,…
Kansas City, MO Budget: $6,500,000.00 2002 Northgate Middle School was renovated in the summer of 2002 as part of the “Cool Schools bond program. A district-wide study was developed to determine the most cost-effective cooling methods for the district. This study determined that rooftop units met the criteria of the School District in the best…